Franklyn Yates Engineering worked together with their clients, Advance (MWH & Balfour Beatty) in successfully completing a full pipework system pressure test on Ringley Fold Pumping Station that is located at Bolton WwTW.
The pressure testing incorporated both the DN 600 & DN 800 above ground FBE coated pipework along with the valves and flowmeters within the system, as well as the DN 1200 below ground pipework.