Severn Trent Water are continuing with investment in Shropshire by renewing one of the booster pumps stations which includes the installation of new upgraded pumps, valves and instrumentation.
Working in close collaboration with Mott MacDonald Bentley (MMB) joint venture, Franklyn Yates Engineering have been selected to carry out the mechanical installation, this includes removal of the existing pumps, installation of all free issued items and final pressure testing of the system.
This is another project that strengthens an already excellent working relationship with the MMB.