Franklyn Yates have secured a contract with new clients Incinco and Cobalt Energy. The work includes the pipework supply and installation within a Grade 2 Listed building that houses the new Malvern Clnical Waste Incinerator.
Franklyn Yates Engineering have been contracted to deliver the design, supply, manufactuer and installation of the hot water and high pressure steam pipework. The contract also includes the installation of the boiler, condenser, heat exchanger and the manufacture and installation of various water holding tanks.