Franklyn Yates have been contracted to complete the final connections between the 'modules' that were installed at Minworth STW by MEPS. The recently installed modules connect to the existing process pipework.
Franklyn Yates' scope of work is to site survey, design, supply, manufacture, install and pressure test the interconnecting manifolds, spools and spigots between the modules and the existing pipework systems.