skip to main content

Franklyn Yates secure second STUTW contract with MMB and United Utilities

Franklyn Yates Engineering have secured the second of the Run to Waste projects that are being delivered by the MMB JV on behalf of United Utilities.

The project at Worsthorne WTW includes the design, supply, manufacture and installation of the DN 600 and DN 800 FBE carbon steel pipework and supports along with the installation of the free issue pumps and valves.

Back to News

Accreditations & Associates

Forefront UKAS
ce
rospa 2023 President's Award
imeche
mhea
rail forum midlands
rail alliance