skip to main content

Franklyn Yates Engineering secure contract with MWH Treatment

The contract we have been awarded revolves around the interconnecting pipework systems to the Primary Screenings Area, the Digested Sludge Transfer Line, the Dewatering Feed Pumping Station, the Centifuge Area and the UV Plant Area on the new TH Plant at Minworth STW in Birmingham.

The work consists of the design, manufacture, supply and installation of the ductile iron pipework and steelwork supports. It includes the installation of all free issued pumps, valves and flowmeters.

Back to News

Accreditations & Associates

Forefront UKAS
ce
rospa 2023 President's Award
imeche
mhea
rail forum midlands
rail alliance