skip to main content

Costain - London Bridge Additional Works

Costain have placed another order with Franklyn Yates to manufacture various grade 316 stainless steel pipework.

This is to be installed as part of the mechanical works on the redevelopment of London Bridge station and the surrounding railway.

Back to News

Accreditations & Associates

Forefront UKAS
ce
rospa 2023 President's Award
imeche
mhea
rail forum midlands
rail alliance